A new residential project was planned on a steep hillside in a rapidly developing suburban area, raising concerns about slope stability and potential landslides. The site, featuring a 30-degree slope, consisted of uncontrolled fill over soft clay, making it highly vulnerable to instability, particularly during heavy rainfall. To ensure the safety of future residents and the surrounding environment, BHM Geotechnical conducted a comprehensive geotechnical assessment, leading to the implementation of an effective slope stabilization plan.
A structured geotechnical assessment and remediation strategy were implemented:
We implemented a comprehensive approach to ensure site safety and durability. Each solution addressed critical factors, from structural support to long-term stability.
Our geotechnical recommendations were successfully implemented, ensuring the foundation was capable of supporting the high-rise structure. Key outcomes included:
The integration of advanced geotechnical solutions by BHM Geotechnical ensured the long-term stability of this hillside residential development. By utilizing a multi-layered approach combining retaining structures, drainage systems, and real-time monitoring, the risks of landslides and erosion were mitigated. This case study highlights the importance of proactive engineering in enabling safe and sustainable development in challenging environments.
Sign up to receive the latest updates and insights on our projects and innovations as we work towards a brighter, sustainable future.