Compaction and Earthworks

Precision Earthworks for Long-Term Stability

Proper compaction and earthworks are vital to prevent settlement, improve bearing capacity, and meet geotechnical design criteria in Sydney’s variable soils. From residential slabs to highway embankments, adherence to AS 3798 (Earthworks) ensures durability against the region’s climate and geological challenges.

Key Processes

Each step, from material testing to compaction, ensures ground stability and durability. Quality control methods verify strength, making construction reliable and long-lasting.

Sydney-Specific Considerations

Reactive soil conditions and variable ground materials in Sydney require specialized treatment. Proper stabilization ensures durability and minimizes future structural issues.

  • Reactive Clays

    Requires moisture conditioning (wetting or drying) before compaction to minimise post-construction movement.

  • Colluvial Soils

    Loose, weathered materials on slopes (e.g., Blue Mountains) may need stabilisation.

  • Urban Fill

    Historical mixed debris in infill sites (e.g., Alexandria) demands selective excavation and replacement.

Challenges

Compliance

Adhering to established guidelines ensures construction quality and safety

Deliverables

Comprehensive documentation ensures compliance and quality assurance.

Drop us an inquiry

Have a question or need more information? Fill out the form below, and our expert team will get back to you as soon as possible to assist with your geotechnical needs.

    Looking for Geotechnical Experts?

    Whether you’re working on basements, foundations or infrastructure projects, our team delivers solutions to suit your site conditions. With BHM Geotechnical, you can break new ground with confidence.Get in touch with our Sydney, Australia office to start planning your next Project!

    cta-img

    Explore Our Other Services

    footer light shape